Sign In | Join Free | My himfr.com |
|
Ask Lasest Price | |
Brand Name : | ZHONGHENG |
Model Number : | ZH |
Certification : | SGS CE ISO9001 |
Price : | USD30000-42000/set |
Supply Ability : | 100 sets/months |
Delivery Time : | 50 working days |
0.3-1.5mm thickness auto change size fast speed stud and track
forming machine
1. Machine picture
2. Panel
3.Specifications
Power Requirement | Voltage | 380v/3ph/50hz |
Motor reducer | 7.5kw (Oumaite brand)+11kw (Oumaite brand) | |
Hydraulic pump | 7.5kw(Xima brand)+5.5kw(Xima brand) | |
Servo motor | 2.3kw( Zhongchen brand ) | |
Forming speed | 0-40 m/min (punch hole) 0-60m/min (without punch) | |
Thickness of structure | 30mm | |
Forming shaft diameter | 60mm | |
Screen | Touch screen | |
Type of cutting | Non-stop cutting | |
Encoder | Omron |
4.Competitive Advantage:
1. CE, ISO,SGS certificates
2. professional production
3. powerful workshop
4. competitive price
5. responsible service
5.Description:
A. We will arrange engineers to supervise installation and make
adjustment for the equipment;
Buyer should pay $50 for each engineer every day. The buyer should
be responsible for transportation
(including round-trip ticket), insurance, accommodation.
B. Guarantee period:
1. The warranty will be maintenance, maintain in the guarantee
period of one year starting from delivery.
Because of the quality of equipment during guarantee period, we
will provide the parts free of charges,
which is in the conditions of correct operation. (Natural disasters
or factors which can’t forced by human
are excluded).
2. If the equipment are out of work in the guarantee period, the
buyer needs our repairman to come to
buyer’s factory, the buyer should be responsible for the
tickets(including round-trip ticket), the fee of
transportation to the buyer’s factory and the fee of accommodation.
Required to change spare parts,
the buyer should afford the freight fee and we don’t ask extra fee.
C. Detail Engineering
1. Lay out and general arrangement drawing
2. Funation lay out drawing
3. eration and maintenance instructions
D. Training
During installation and adjustment of the equipment, our engineers
shall provide the training to buyer’s
personnel to operate and maintain the equipment. Additional trading
can be provided on request.
1. Foundation construction, electrical works, and civil
engineering;
2. Electrical wire, mechanical tubes, water tubes between machines;
3. Lubricating oil, recirculation oil, gear box oil, recirculation
cooling water;
4. Safety equipments and non-standard safety items;
5. Testing material;
6. Engineering service required at the buyer’s site.
.6.Applications:
This machine can make different sizes stud and track by automatically no need change the rollers
7. contact us
![]() |